Aller au contenu

About LabS

Founded in 2019, LabS builds on the expertise developed over the past decades by researchers, engineers, and structural technicians at the Université de Sherbrooke.

Structural Hall opening

Construction of the reaction wall

Installation of the shaking table

First hybrid test

Construction of the CFI laboratory and installation of the Mega Press

Dynamic analysis of the Daniel-Johnson Dam

Foundation of the LabS platform

Installation of the multiaxial loading system (MASS)